| Good output per employee | Good output (net of scrap) of the plant in the period divided by average headcount for the period (all departments).= Good output / Average headcount | Number |
|---|
| Overtime hours per 1,000 good units | Total employee overtime hours in the period times 1,000 divided by good output in the same period; a rise means the plant needs more overtime to produce the same volume.= Overtime hours * 1000 / Good output | Number |
|---|
| Payroll cost per good unit | Total payroll cost (salary, allowances, overtime, employer-paid insurance) for the period divided by good output in the same period.= Payroll cost / Good output | Currency |
|---|
| Absence days | Number of scheduled working days on which employees were absent (annual leave, sick leave, unpaid leave, other). | Count |
|---|
| Absence rate | Absence days divided by scheduled working days.= Absence days / hr_scheduled_days | Ratio (%) |
|---|
| Applicants | Number of candidates who applied in the period (by application date). | Count |
|---|
| Average headcount | Average number of active employees per day in the period.= hr_headcount_days / hr_snapshot_days | Number |
|---|
| Average monthly cost per employee | Payroll cost divided by the number of payslips (one employee-month each).= Payroll cost / hr_payslips | Currency |
|---|
| New hires | Number of employees with a start date in the period. | Count |
|---|
| Offer acceptance rate | Offers accepted divided by offers sent in the period.= hr_offers_accepted / Job offers sent | Ratio (%) |
|---|
| Job offers sent | Number of candidates sent a job offer in the period (by offer date). | Count |
|---|
| Overtime hours | Total overtime hours recorded in timesheets. | Number |
|---|
| Payroll cost | Total employer cost of personnel: base salary, allowances, overtime pay and employer-paid insurance. Payroll is recorded monthly, on the first day of the month. | Currency |
|---|
| Terminations | Number of employees whose last working day falls in the period, both voluntary and involuntary. | Count |
|---|
| Average time to hire (days) | Average number of days from application to offer date for hired candidates, by offer date.= hr_hire_days_total / hr_offers_accepted | Number |
|---|
| Turnover rate | Terminations in the period divided by average headcount for the period.= Terminations / Average headcount | Ratio (%) |
|---|
| Voluntary terminations | Number of employees who resigned, with their last working day in the period. | Count |
|---|
| Voluntary turnover rate | Voluntary terminations in the period divided by average headcount for the period.= Voluntary terminations / Average headcount | Ratio (%) |
|---|
| Availability | Run minutes divided by planned minutes. The first component of OEE.= mfg_run_minutes / mfg_planned_minutes | Ratio (%) |
|---|
| Completed work orders | Work orders completed in the period, by completion date. | Count |
|---|
| Inspection defect rate | Defective samples divided by inspected samples across the inspection lots in the period.= mfg_defect_qty / mfg_inspected_qty | Ratio (%) |
|---|
| Downtime minutes | Total machine downtime minutes recorded in the period, for every reason (including changeovers and scheduled maintenance). | Number |
|---|
| First pass yield (FPY) | Good output divided by total output. The quality component of OEE.= Good output / Total output | Ratio (%) |
|---|
| OEE (overall equipment effectiveness) | Availability x performance x first pass yield, computed on the period totals.= (mfg_run_minutes / mfg_planned_minutes) * (Total output / mfg_ideal_output) * (Good output / Total output) | Ratio (%) |
|---|
| On-time completion rate | Work orders completed on time divided by work orders completed in the period.= mfg_on_time_work_orders / Completed work orders | Ratio (%) |
|---|
| Good output | Good units (total output minus scrap) produced in the period's shifts, by shift date. | Count |
|---|
| Output value | Good output multiplied by the item's standard selling price, by machine shift date. | Currency |
|---|
| Performance | Total output divided by the ideal output for the run time. The second component of OEE.= Total output / mfg_ideal_output | Ratio (%) |
|---|
| Total output | Total units produced in the period's shifts, including both good units and scrap. | Count |
|---|
| Scrap rate | Scrap units (total output minus good output) divided by total output.= (Total output - Good output) / Total output | Ratio (%) |
|---|
| Unplanned downtime share | Unplanned downtime minutes divided by total downtime minutes.= mfg_unplanned_downtime_minutes / Downtime minutes | Ratio (%) |
|---|